banner
Products
Innovative R&D and efficient production form the backbone of our organization.
Felt Calender or Blanket Heat Setting Machine

Felt Calender or Blanket Heat Setting Machine

Introduction The machine is used for processing cotton and cotton-blend tubular fabric. It equipped with reinforced supp;
Basic Info.
Warranty 1 Year
Customized Customized
Condition New
Heating Methods Steam
Production Time 25days
Speed 3-30m/Min
Transport Package Exporting Standard
Specification 8675(4 boxes)/12900(6 boxes)
Trademark FINESTART
Origin Jinan, China
Production Capacity 100units/Year
Product Description


Introduction

  1. The machine is used for processing cotton and cotton-blend tubular fabric. It equipped with reinforced support plate, 14mm thickness of NOMEX blanket and mechanical folding machine. After processing with this machine, the fabric could reach certain size and smooth appearance.
  2. The Calendering Machine is an economic and easy operation model of textile machine. It can meet normal requirements of fabric processing.
  3. The Maximum width of the fabric: Single 1500mm; Dual 2x800mm
  4. We can provide the following machine based on different heat sources: Steam / electricity + oil (inner loop).
  5. Steam-heated drying cylinder is 130°C Max and the other model is higher than 180°C.
  6. The machine can process thick fabric (three-layer insulation fabrics).

Design Drawing

Main technical parameter

  • Working width 1450mm(cylinder length 1550mm)
  • Machine speed 3~30m/min
  • Technical speed (actual speed when working) 15-20m/min(depends on process)
  • Steam box steam consumption 60~100kg/hour
  • Temperature control precision ±1
  • Cylinder heating pattern: steam heating(consumption:4-6Kg/cm²steam 80-100Kg/H;)
  • Electric oil(consumption:25-30KW/H)
  • Circulation oil( consumption 30000-50000Kcal/ H)
  • Machine power
  • Steam heated 10Kw
  • Electric oil 46 KW/H
  • Circulation oil 10Kw
  • Dimension(L*W*H) 6400X2750X2250mm
  • Weight 4.5tons


Payment Terms
Payment Conditions: 30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight.
Delivery time: 30-60 days from the date of receiving down payment. All payment should be received before delivery in China.

Any questions and requirments,contact us now!




Send inquiry